| 差压变送器维护措施 |
| 添加时间:2019/1/25 16:07:27 浏览次数: |
Maintenance Measures of Differential Pressure Transmitter 1、安装措施合理选择安装地点:干燥、无雨雪滴漏的地方。 1. Reasonable selection of installation site: dry, no rain and snow drip leakage. 2、点检措施有条件时由专人每日对保温材料的是否破损、蒸汽管路的是否堵塞进行技术确认与技术处置。 2. Technical confirmation and technical disposal of whether the insulation material is damaged and whether the steam pipeline is blocked are carried out by the special person daily when the spot inspection measures are conditional. 3、巡检措施由区域仪表维护责任人按预定巡检路线定时巡检。巡检中要检查保温管线阀门是否正常、保温箱是否正常、疏水装置是否正常、保温材料包装是否完好、电伴热供电元器件是否正常等。对易冻装置仪表进行重点检查并做好巡检记录,进行仪表及其保温防冻措施进行干燥、完整、洁净的维护保养,及时解决现场发生的保温伴热问题。 3. Inspection measures shall be regularly inspected by the person responsible for the maintenance of regional instruments according to the scheduled inspection routes. Inspection should check whether the insulation pipeline valves are normal, whether the insulation box is normal, whether the hydrophobic device is normal, whether the insulation material packaging is intact, whether the electrical heating power supply components are normal, etc. The instrument of freezing-prone device should be inspected emphatically and patrol records should be made well. The instrument and its insulation and freeze-proof measures should be maintained dry, complete and clean, so as to solve the problem of heat preservation and tracing on site in time.ganzaoji.75ix.com ganhuaji.75ix.com tuoshuijid.75ix.com tanhualu.75ix.com hongganj.75ix.com hongganji.75ix.com 4、报警措施有条件的可加装蒸汽泄露或断电状态的声光报警小装置,以方便保温防冻措施隐患的发现与及时整治。 4. Acousto-optic alarm devices can be installed when the alarm measures are conditional, so as to facilitate the discovery and timely remediation of hidden dangers of insulation and anti-freezing measures. 5、转换器是否发生故障。 5. Whether the converter fails or not. |
| 上一页 传感器测量的是何种压力? |
| 下一页 压力变送器使用注意事项 |
Copyright © 技术支持:遨游网络